Bay Bridge Temporarily Down to ONE Lane Towards the Beach

From MD Transportation Dept. e-mail

Two-Way Operations Suspended
Expect Extensive Eastbound Delays
at Bay Bridge
During Evening Rush Hour

For motorists’ safety, two-way operations have been suspended from the westbound span of the Bay Bridge due to rain and poor visibility.

One lane on the eastbound span is open for eastbound travelers, while the right lane of the eastbound span remains closed for repairs.

We will attempt to resume two-way operations if and when weather conditions improve.

The MDTA urges motorists to stay alert and use caution when traveling the bridge:
• Call 1-877-BAYSPAN (1-877-229-7726) for 24/7 traffic conditions at the bridge.
• Visit baybridge.com to view live traffic cameras at the bridge and to sign up for traffic and email alerts.
• Obey posted speed limits and overhead lane-control signals.
• Stay alert — do not change lanes while traveling over the bridge.
• Make sure your vehicle is “road ready”– one disabled vehicle can cause extensive backups.

Leave a Reply